New Haven, CT

Yale School of Medicine, Sterling Hall of Medicine, B-Wing Extension

Scope/Solutions

Named in honor of philanthropist John William Sterling, Yale’s Sterling Hall of Medicine was dedicated in 1925. The school wanted to extending the building’s B-wing over an existing loading dock and renovate the existing building. The project includes a three-story addition housing laboratory and office space for the Center for Drug Discovery and renovations to 24,000 sq ft of office, laboratory, and support space for the Department of Pharmacology. SGH was the structural engineer of record for the project.

SGH designed the addition’s structure that is supported from four cruciform mega-columns, maximizing the open space for the loading dock beneath the structure.  Highlights of our work include:

  • Developing a system of story-deep trusses to support the building and transfer most of the superstructure loads to the four mega-columns
  • Designing a moment frame for the superstructure to maximize flexibility for the laboratory program
  • Detailing truss connections to expedite fabrication and shop drawing reviews
  • Updating the loading dock with a new high-performance pavement system

Project Summary

Icon: completion-date

2002

Completion Date
Icon: construction-value

14M (addition)

Construction Value
Icon: building-size

23.7K (addition)

Project Size
Solutions
New Construction
Services
Structures
Markets
Education
Client(s)
Payette Associates Inc.

Key team members

Pedro Sifre
Senior Principal

Additional Projects

Northeast

St. Paul’s School, Ohrstrom Library

Ohrstrom Library, built in the early 1990s, features sloped roofs and brick cladding with a stone base. School personnel reported deteriorating masonry and water leakage at multiple locations. SGH investigated the condition of the building enclosure and designed repairs.
Explore
Northeast

Lynn Classical High School

Lynn Classical High School is a one- to three-story structure built on construction debris fill. Shortly after construction, staff observed water leakage and significant damage due to settlement of the structure. SGH investigated the causes of the issues.
Explore