Towson, MD

Towson University, Glen Towers

Scope/Solutions

The Glen Complex at Towson University includes four high-rise residential towers with a central dining facility connected by an outdoor plaza. Originally constructed in 1983, the university elected to update and improve the complex. SGH consulted on the design of the building enclosure and provided building enclosure commissioning services from the early stages of design through construction.

SGH assessed the condition of the exposed concrete walls and floor slab edges at the four towers. We provided the project team with conceptual repair options and opined on the feasibility of anchoring new cladding to the exterior. SGH assisted with designing building enclosure improvements, including over- and re-cladding the four towers and waterproofing for the connected plaza. Highlights of the enclosure revitalization include:

  • Demolishing the existing stud-framed backup walls and erecting new shop-fabricated wall panels delivered to site complete with stud framing, sheathing, air/water barriers, insulation, metal panel cladding, and aluminum-framed windows
  • Covering the exposed aggregate concrete exterior walls with a fluid-applied air/water barrier, insulation, and terra cotta cladding
  • Integrating the new walls with the existing modified bitumen roofing assembly
  • Incorporating packaged thermal air conditioning units into the exterior wall at each dorm
  • Refurbishing exterior entrance canopies
  • Installing a new plaza waterproofing system

SGH provided construction phase services, including visiting the site to observe construction for compliance with the owner’s performance requirements and design documents, reviewing contractor submittals, responding to requests for information, observing ongoing construction, conducting field quality control testing on the new enclosure systems, and helping the project team address field conditions.

Project Summary

Icon: completion-date

2025

Completion Date
Icon: construction-value

32.5M

Construction Value
Solutions
Repair & Rehabilitation
Services
Structures | Building Enclosures
Markets
Education
Client(s)
Design Collective
Specialized Capabilities
Repair & Strengthening | Commissioning | Condition Assessments | Roofing & Waterproofing

Key team members

Brian Rose
Senior Project Manager
Nicholas Piteo
Principal

Additional Projects

Mid-Atlantic

Fluvanna County High School, Stormwater Detention System

The new Fluvanna County High School included four buried, stackable crate-type, stormwater detention systems under deep cover. Shortly after installation in 2010, the contractor observed that the backfill material over two of the detention systems had settled. SGH investigated the cause of failure.
Explore
Mid-Atlantic

Drexel University, Korman Center

Drexel University undertook a project to renovate the building and construct a new 3,500 sq ft addition that features a curtain wall facade with exterior sunshades. SGH provided building enclosure consulting services for the project and also served as engineer of record for the roof replacement.
Explore