Lake Livingston Hydroelectric Plant
East Texas Electric Cooperative (ETEC) commissioned construction of a new hydroelectric plant at the site of the fifty-year-old Lake Livingston Dam, an approximately 2.5 mi earthen embankment that impounds a water supply reservoir. The project included constructing an intake structure at the embankment, three reinforced concrete penstocks, and a powerhouse on the downstream side of the existing spillway and along the Trinity River. SGH provided engineering services during construction of the hydroelectric plant and continues to serve as the chief dam safety engineer, as required by the Federal Energy Regulatory Commission (FERC).