Neponset River Bridge
A subsequent engineering study found that the cracks were due to over-stresses in the flexural steel and abrupt termination of flexural steel in a tension zone.
New York, NY
Scope/Solutions
Portions of the New York City subway have been open for more than 100 years and many stations do not meet modern accessibility standards. The Metropolitan Transportation Authority (MTA) undertook a project to replace and upgrade elevators at twenty-six subway stations, including nineteen that lacked an accessible entry. SGH consulted on fire life safety aspects of the installations.
SGH worked with the general contractor and the MTA, who served as the Authority Having Jurisdiction for the project. Highlights of our work include:
Project Summary