Northeast
225 Binney Street
SGH provided building enclosure consulting services for renovating two historic, brick masonry buildings and constructing a new, six-story office building with below-grade parking at 225 Binney Street.
Waltham, MA
Scope/Solutions
Hobbs Brook Management wanted to renovate their 1989 office building at 81 Wyman Street and undertook a project to replace the exterior cladding and alter the interior of the three-story structure. SGH provided structural and building enclosure engineering services for the project.
SGH served as the structural engineer of record for the repositioning project. Highlights of our work include the following:
We also assisted with the building enclosure design, including a metal panel rainscreen system, foundation-supported aluminum-framed curtain wall, new roof, and point-supported glass canopy. Highlights of our work include the following:
Project Summary