Acton, MA

Acton-Boxborough Regional High School Pool

Scope/Solutions

The natatorium was constructed in the early 1970s as an addition to the high school. The pool and deck are constructed of reinforced concrete and precast plank forms the ceiling. SGH evaluated the condition of the natatorium as part of a school improvement plan and subsequently designed repairs.

The building committee wanted to ensure that the natatorium would meet the requirements for the design life of the new school addition. SGH performed a review of the pool operations, a delamination and corrosion survey of the pool deck, and corrosion testing and chloride sampling of the precast concrete roof structure and cast-in-place concrete deck and pool walls.

 

Based on the results of the investigation, SGH developed repair options to address deterioration, chloride contamination, and leakage. We developed concrete repairs, including completely replacing the deck, locally repairing other concrete elements, and integrating a modern pool water circulation and collection system in the pool edge.

 

SGH provided construction administration services, including reviewing contractor submittals, observing repair work to compare with the design intent, and troubleshooting unforeseen field conditions.

Project Summary

Icon: completion-date

2005

Completion Date
Solutions
Repair & Rehabilitation
Services
Structures | Applied Science & Research
Markets
Education
Client(s)
Design Partnership of Cambridge
Specialized Capabilities
Repair & Strengthening | Materials Science | Microscopy

Key team members

Paul Kelley
Consulting Principal

Additional Projects

Northeast

University of Massachusetts, Boston Harbor Campus

DCAM retained SGH to conduct a study for the repair of the plaza and two substructure levels, and to design remedial work to address existing deterioration and extend the useful life of the facility.
Explore
Northeast

Emerson College, Little Building

The college undertook a project to replicate the street-facing facades and coupled that with a major renovation and modernization, extending the useful life of the residence hall for many years. SGH consulted on the facade replacement and renovation.
Explore