Central Artery Tunnel Project Leakage Investigation

Scope/Solutions

The Central Artery/Tunnel (CA/T) Project relocated Boston’s elevated Central Artery below ground. Systemic water leakage at the tunnel roof to slurry wall intersection created a long-term corrosion threat to the roof girders and caused widespread ice buildup at the roof level in the winter. SGH investigated the causes of leakage and assisted Modern Continental Construction (Modern) with locating and quantifying the leakage as part of their remediation efforts.

SGH reviewed project documents, conducted a field investigation, and determined that the leakage was inherent to the slurry wall system. We assisted Modern with developing methods to address the leakage and presented our findings to help the associated parties reach resolution and move forward with repairs.

During the repair phase, SGH supported the system-wide observation of each roof bay’s condition. We documented existing conditions and noted leakage, if any. SGH designed repairs to mitigate leakage and strengthen certain areas of the panels. We also helped Modern address special conditions that arose during the repair work and evaluated the repair performance over time.

Project Summary

Icon: completion-date

2005

Completion Date
Solutions
Failure Investigation | Repair & Rehabilitation
Services
Structures
Markets
Infrastructure & Transportation
Client(s)
Modern Continental Construction
Specialized Capabilities
Repair & Strengthening

Key team members

Paul Kelley
Consulting Principal

Additional Projects

Northeast

Boston Marine Industrial Park Parcels C-1 and C-2

The Economic Development & Industrial Corporation (EDIC) wanted to study options for adding parking and multi-use space at Boston Marine Industrial Park. SGH was the prime consultant leading the study and was the structural engineer for the project.
Explore
Northeast

Stop & Shop

Shop & Stop Store #539 is constructed with a rooftop parking deck over the supermarket. SGH was the engineer of record for a new split-slab waterproofing system design, and also evaluated and developed repairs to address concealed damage to the building structure and parking deck.
Explore