Fitchburg, MA
Fitchburg State University, Science Facility Modernization
Scope/Solutions
Originally constructed in 1963, the three-story Condike Science Building needed renovations to improve the performance and function of the facility. Fitchburg State University undertook a comprehensive renovation of the existing building and built a new 57,700 sq ft addition to house the Biology, Chemistry, Physics, and Geophysical Science departments. SGH was the Building Enclosure Commissioning Agent (BECxA) for the project.
As the BECxA, SGH performed the following work:
- Evaluated design concepts for modernizing the existing building enclosure systems, including replacing strip windows, roofing, and flashing
- Reviewed designs for building enclosure systems on the new addition, including below-grade waterproofing systems, metal panel and brick rainscreen wall systems, windows, curtain walls, and roofing
- Provided design recommendations to improve building enclosure performance at the existing building and the new addition
- Developed laboratory and field testing requirements for all building enclosure systems to verify performance
- Observed ongoing building enclosure construction to compare with the design intent and performance expectations
- Conducted field testing, including air infiltration and water penetration testing of windows, water penetration testing of curtain walls, adhesion testing of water-resistive barriers, and adhesion testing of sealants
1 of 5
Project Summary
Solutions
New Construction
Services
Warning: Undefined variable $category in /home/sgh/sgh.circles.studio/wp-content/themes/sgh/single-project.php on line 186
Warning: Trying to access array offset on null in /home/sgh/sgh.circles.studio/wp-content/themes/sgh/single-project.php on line 186
Warning: Attempt to read property "name" on null in /home/sgh/sgh.circles.studio/wp-content/themes/sgh/single-project.php on line 186
Warning: Undefined variable $category_id in /home/sgh/sgh.circles.studio/wp-content/themes/sgh/single-project.php on line 194
Markets
Education
Client(s)
CBT Architects
Key team members
Additional Projects
Northeast
Massachusetts Institute of Technology, International Design Center, Tectonics of Transparency: The Wall
Acting as a symbol of the creative and cutting-edge work taking place in the center, the sculpture is not made of typical laminated glass units. SGH provided structural design services for the project.
Northeast
Bridge Boston Charter School
Bridge Boston Charter School offers an intensive, success-focused learning program for the city’s at-risk students. SGH was the structural engineer of record for the adaptive reuse of the 1970s brick masonry structure, and construction of a new 3,000 sq ft addition and stand-alone gymnasium.




