Glendale, CA

Glendale High School Administration Building

Scope/Solutions

Constructed in 1969, this two-story building houses administrative offices and the school library. As part of a campus modernization project, Glendale High School wanted to mitigate the seismic deficiencies resulting from a soft-story irregularity. SGH evaluated the existing concrete structure and developed a seismic retrofit program.

SGH performed nonlinear static pushover analysis following ASCE 41 guidelines. We established performance objectives to provide Life Safety in a 500-year earthquake and Collapse Prevention in a 2500-year earthquake.  Highlights of our retrofit design include the following:

  • Reduced the high drift demand of the soft-story structure by adding eight diagonal braces
  • Used friction dampers in the braces to limit the force transferred into the existing structure and reduce the demands on brace connections to the existing structure
  • Improved the building’s tolerance to drift by jacketing concrete columns with steel shells, increasing the ductility

 

Our approach necessitated a more intensive structural analysis, but allowed us to develop a more cost-effective and constructible solution than could be achieved with code-based procedures and elastic analyses. SGH performed the analysis, design, and production of construction documents for the alternative solution on a expedited schedule to meet the scheduled design completion date.

Project Summary

Icon: completion-date

2011

Completion Date
Solutions
Repair & Rehabilitation
Services
Structures
Markets
Education
Client(s)
gkkworks
Specialized Capabilities
Seismic Engineering

Key team members

Ronald Hamburger
Consulting Principal

Additional Projects

West

University of California, The Law Building Infill Addition

Surrounded by the existing wings of the Law Building, the infill addition holds a law library in two below-grade levels. SGH was the building enclosure consultant responsible for the design of the addition's waterproofing