Northeast
MBTA Quincy Commuter Boat Terminal
The top of the wall moved outward and the soil behind the wall subsided several feet. SGH led a multi-disciplinary team to evaluate the seawalls and concrete wharf, recommended remedial work, and designed seawall and wharf stabilization measures.

