The John W. Weeks Footbridge spans the Charles River, connecting the Harvard Business School in Boston’s Allston neighborhood with Harvard’s main campus in Cambridge.  The bridge, built in 1926, carries the university’s utilities and pedestrian traffic.  As part of an on-call term contract with the Department of Conservation and Recreation (DCR) and with additional design funding provided by Harvard University, SGH worked on a two-phase project to repair and upgrade the bridge.

Phase 1.  SGH assessed the condition of the limestone railings and noted severe deterioration of the limestone balusters.  Based on our recommendations, DCR opted to completely dismantle the balusters and rails, install new stainless-steel pins, replace certain balusters, clean the limestone, and reassemble the balustrade.  SGH prepared final repair drawings and technical specifications, assisted the DCR with bid-phase services, and conducted periodic site visits during the repair work.

 

Phase 2.  SGH performed a hands-on inspection of the entire structure, including the concrete, limestone, brick, and stone masonry elements.  We designed repairs for the concrete deck, arches, and walls; lateral restraints for the spandrel walls; and removal of obstructive stairs with new grading on the ends of the bridge deck and the approach paths to comply with the Americans with Disabilities Act.  We specified historically appropriate light fixtures and additional cleaning, repair, and preservation of masonry architectural features.  Following extensive assistance with DCR’s public-outreach process to key stakeholders, SGH prepared final repair drawings and technical specifications for the structural and architectural work; coordinated survey, civil, environmental, and lighting disciplines; assisted DCR with bid-phase services; and conducted periodic site visits during the repair work.

Project Summary

Icon: completion-date

2015

Completion Date
Icon: construction-value

2.5M

Construction Value
Solutions
Repair & Rehabilitation | Preservation
Services
Building Enclosures | Structures
Markets
Infrastructure & Transportation
Client(s)
Commonwealth of Massachusetts Department of Conservation and Recreation
Specialized Capabilities
Repair & Strengthening | Marine & Civil Works | Preservation

Key team members

Scott DiFiore
Managing Principal, Heavy Civil, Boston

Additional Projects

Northeast

Storrow Drive Interchange/Tunnels

Upon discovery of severe spalling of the overhead roof slab and corrosion of the supporting steel beams, the Commonwealth needed a detailed condition survey, structural review, and design of emergency and permanent repairs.
Explore
Northeast

Court Square Parking Garage

Set in the urban area of Court Square, the new 193-space parking garage was scheduled to be built following the demolition of an existing structure. SGH was prime consultant, function designer, and structural engineer of record for the project.