Arecibo to San Juan, Puerto Rico

North Coast Superaqueduct

Scope/Solutions

The 72 in. dia. North Coast Superaqueduct carries water 70 km from Arecibo to San Juan. Just after construction, the aqueduct experienced failure of two pipe segments during a transient pressure event caused by sudden closure of a valve. SGH investigated the cause of failure and assessed the condition of the entire pipeline.

Highlights of our work on this project include the following:

  • Performed a condition assessment that included internal and external pipeline inspection, hydrostatic testing, wire strain test, mechanical testing of wires, tests of hydrogen content in wire, and soil corrosivity testing
  • Performed hydraulic and structural analyses
  • Conducted mechanical, metallurgical, chemical, and petrographic testing of pipe constituent components
  • Conducted chemical analysis of soil and groundwater
  • Discovered pipes with low prestress level in the wire and performed tear-down inspection of low prestress pipe
  • Determined failure to be result of the transient pressure event caused by sudden closure of a valve due to improper setting of the valve closure timing and inadequate prestress in manufactured pipe caused by breakage of wires during winding operations
  • Designed repairs that consisted of post-tensioning the low prestress pipes with strands and applying a shotcrete coating on the post-tensioned pipe

Project Summary

Icon: completion-date

2004

Completion Date
Solutions
Failure Investigation
Services
Structures | Advanced Analysis | Applied Science & Research
Markets
Infrastructure & Transportation
Client(s)
Dick Corporation
Specialized Capabilities
Repair & Strengthening | Buried Infrastructure | Failure Analysis | Materials Science

Key team members

Rasko Ojdrovic
Senior Principal
Mehdi Zarghamee
Consulting Principal

Additional Projects

Northeast

Court Square Parking Garage

Set in the urban area of Court Square, the new 193-space parking garage was scheduled to be built following the demolition of an existing structure. SGH was prime consultant, function designer, and structural engineer of record for the project.
Explore
West

Alameda Landing Wharf Rehabilitation

The wharf at Alameda Landing was originally built in the 1940s for the U.S. Navy's Fleet Industrial Supply Center. SGH served as engineer of record for the wharf rehabilitation.
Explore