Northeast
Portsmouth Navy Yard, Modular Submarine Enclosure
The contractor engaged SGH to assess the damage and design repairs to restore the damaged modules to their original condition.
Plymouth, MA
Scope/Solutions
In response to Nuclear Regulatory Commission (NRC) post-Fukushima (FLEX) requirements, Entergy sought to install a 21,000 gal, mobile frac tank for temporary water storage at their Pilgrim Nuclear Power Station (PNPS). SGH evaluated the structural and seismic performance of the steel tank, manufactured by PCI Manufacturing, LLC.
SGH reviewed the design proposed by PCI Manufacturing, LLC and provided recommendations to ensure adequate strength and stability. Highlights of our work include the following:
Project Summary