A portion of The Colonade’s parking structure, constructed with precast concrete plank supported on precast prestressed concrete beams, was beyond repair.  SGH worked with the demolition contractor to develop construction documents for the selective demolition of the structure.

For the development of the demolition sequencing, the project team needed to take into consideration the occupied office space below the garage, the adjacent elevated parking structure, and that the garage was three stories above the adjacent finished grade.

SGH helped establish limits on the weight of demolition equipment and debris, and worked with the demolition contractor to develop a sequence that would ensure stability of the structure as demolition progressed.

Our work for this project included the following:

  • Evaluation of the structures for construction loading
  • Design of shoring and bracing
  • Design of new barrier rail
  • Development of demolition drawings to obtain a permit
  • Construction administration

Project Summary

Icon: completion-date

2008

Completion Date
Icon: construction-value

350K

Construction Value
Solutions
New Construction
Services
Structures
Markets
Infrastructure & Transportation
Client(s)
Metropolitan Properties of America, Inc.
Specialized Capabilities
Temporary Construction

Key team members

Greggrey Cohen
Greggrey Cohen
Managing Principal, Structural Repair and Rehabilitation, Boston
Paul Kelley
Consulting Principal

Additional Projects

Mid-Atlantic

Zurich Insurance Group, New Parking Garage

Zurich’s facility improvement plan required additional parking for over 1,000 vehicles and needed the parking structure to be operational within sixteen months from the start of design. SGH served as the prime design professional for this 1,100 car, four-story concrete parking structure.
Explore