Frankfort, KY
Crom Corporation, Elevated Prestressed Concrete Water Tanks
Scope/Solutions
Since the early 1980s, SGH has worked with Crom Corporation to assist them in their tank designs. Crom is one of the largest manufacturers of prestressed concrete tanks in the United States. The elevated tanks, with a capacity of between 1.5 MG and 2.0 MG, are thin prestressed concrete shell structures.
The engineering challenges include the structural and foundation design, and the prestressing effects on the weight of the tank and the stored water.
Highlights of SGH’s work for Crom include the following:
- Developed the preliminary design, accounting for several factors:
- The effects of the tank weight on the structure
- Prestressing to prevent tensile stresses in the thin shell components
- Overturning resistance of the foundation
- Performed finite element analyses, including dynamic fluid-structure interaction resulting from wind and seismic loads
- Reviewed prestressing plans for placement and adequate strength
1 of 2
Project Summary
Solutions
Repair & Rehabilitation
Services
Structures
Markets
Infrastructure & Transportation
Client(s)
Crom Corporation
Key team members
Additional Projects
South
Lake Livingston Hydroelectric Plant
East Texas Electric Cooperative (ETEC) commissioned construction of a new hydroelectric plant at the site of the fifty-year-old Lake Livingston Dam, an approximately 2.5 mi earthen embankment that impounds a water supply reservoir. The project included constructing an intake structure at the embankment, three reinforced concrete penstocks, and a powerhouse on the downstream side of the existing spillway and along the Trinity River. SGH provided engineering services during construction of the hydroelectric plant and continues to serve as the chief dam safety engineer, as required by the Federal Energy Regulatory Commission (FERC).
South
Precast Concrete Arch
A precast concrete arch allowed mine vehicles to pass over U.S. Highway 191. A few months after the buried bridge was put into service, the mine operator observed separation of the headwall panels and longitudinal cracks in the highway. They retained SGH to investigate the bridge's condition.