Wellesley, MA

Hunnewell Elementary School

Scope/Solutions

The town of Wellesley needed a new elementary school to replace an outdated 1930s structure. The new two-story building includes eighteen classrooms with capacity for 365 students. Wanting to ensure the school would operate as desired, the town elected to follow the Massachusetts School Building Authority’s design processes and standards, including commissioning the building. SGH served as the building enclosure commissioning (BECx) provider for the project.

SGH focused on the design and performance of below-grade waterproofing, brick and stone veneer-clad wall assemblies, punched windows and doors, multistory curtain walls, and membrane roofing assemblies. Highlights of our work includes the following:

  • Helping establish performance expectations by developing a BECx plan/specification, and outlining testing requirements, project team roles and responsibilities, and procedures for documenting and resolving construction-related issues
  • Reviewing the enclosure design, including the owner’s project requirements and basis of design at critical phases, and providing recommendations to improve the enclosure’s performance, energy efficiency, and constructibility
  • Reviewing submittals and shop drawings to verify consistency with design intent
  • Providing construction phase services, including coordinating commissioning activities with the contractor, observing the building enclosure installation to compare with the project requirements, and helping the contractor address field conditions
  • Conducting testing to help the owner verify they achieved their performance goals:
    • Water/air leakage testing for fenestration systems
    • Air barrier adhesion testing and air infiltration testing
    • Whole building air-leakage testing
    • Infrared surveys of walls and roofs to identify thermal anomalies potentially associated with enclosure deficiencies, such as wet materials or air leakage
  • Preparing a final commissioning report summarizing completed work and identifying any construction deviations, site observations, or unresolved issues
  • Performing a follow-up review of the building enclosure ten months after occupancy

Project Summary

Icon: completion-date

2024

Completion Date
Icon: construction-value

45M

Construction Value
Icon: building-size

77K

Project Size
Solutions
New Construction
Services
Building Enclosures | Applied Science & Research
Markets
Education
Client(s)
Compass Project Management
Specialized Capabilities
Commissioning | Facades & Glazing | Roofing & Waterproofing | Environmental Simulations

Key team members

Emily Hopps
Emily Hopps
Executive Principal, Building Technology, East

Additional Projects

Northeast

MBTA Kendall/MIT Station Entrance

As part of the Kendall Square Initiative—a collaborative development created by the Massachusetts Institute of Technology (MIT) and private partners—the MBTA Kendall/MIT station was upgraded with a new headhouse designed to improve accessibility.
Explore
Northeast

Harvard University, Lowell House

Lowell House, a neo-Georgian building constructed in 1930, is Harvard University’s largest undergraduate residence hall. SGH provided building enclosure and structural engineering services for the project.
Explore