Lowell General Hospital

Scope/Solutions

Lowell General Hospital planned to expand the existing parking facility and required a design team with experience in designing vertical additions to parking garages and the flexibility to accommodate the hospital’s operational needs. We were the prime consultant, structural engineer of record, and the precast concrete designer for the project.

The original three-level parking garage included accommodations for two additional levels.  Originally providing 240 parking spaces in 75,000 sq ft, the existing parking garage was expanded with a two-level vertical addition that added 130 spaces and 45,000 sq ft.

The original garage consisted of a precast concrete superstructure supported on cast-in-place spread footing foundations and we designed the structure for the vertical addition.  Our design also included structural modifications for the vertical expansion of the elevator that consisted of removing the roof structure and splicing the new precast concrete walls with the existing walls.  This creative solution helped expedite the erection time and assisted the hospital in meeting the high demand for outpatient parking sooner.

As the prime consultant, we also coordinated with the construction manager and the precast concrete manufacturer to achieve the proper transition between the new and existing levels.

Project Summary

Icon: completion-date

2009

Completion Date
Solutions
New Construction
Services
Structures
Markets
Infrastructure & Transportation
Client(s)
The MacMillin Company
Specialized Capabilities
Building Design

Additional Projects

Northeast

LaGuardia Airport, Terminal B

As part of a major modernization project, LaGuardia Airport is constructing a new Terminal B to replace the existing Central Terminal Building. SGH consulted on flood requirements and the fire life safety design for the project.
Explore
Northeast

John W. Weeks Footbridge

As part of an on-call term contract with the Department of Conservation and Recreation (DCR) and with additional design funding provided by Harvard University, SGH worked on a two-phase project to repair and upgrade the bridge.
Explore