During construction of an approach span to a new bascule bridge, New York City Department of Transportation questioned the finishing procedures and long-term durability of the concrete bridge deck. Working for the construction team, SGH evaluated the concrete finish and materials to determine if the in-place materials satisfied the project specification requirements.

SGH evaluated the concrete and developed recommendations to enhance the expected durability of the concrete. Highlights of our work include:

  • Reviewing the New York City Department of Transportation specifications for high‑performance concrete, which was required for the new deck
  • Using ground penetrating radar to identify locations where core sampling would not impact the embedded reinforcing steel
  • Measuring surface crack widths and depths at extracted core samples
  • Performing testing in our laboratory to evaluate the concrete’s chloride ion permeability per ASTM C1202
  • Recommending the contractor apply a methyl methacrylate sealer to the approach span to reduce permeability
  • Collaborating with the construction team to coordinate the bridge deck tining with the sealer installation

Project Summary

Icon: completion-date

2024

Completion Date
Solutions
Evaluation
Services
Structures | Applied Science & Research
Markets
Infrastructure & Transportation
Client(s)
Unionport Constructors, JV
Specialized Capabilities
Repair & Strengthening | Materials Science

Key team members

Keith Kesner
Project Director
Nathaniel Smith
Managing Principal, Structural Engineering, New York

Additional Projects

Northeast

MBTA Kenmore Square Bus Station Canopy

The Kenmore Station Bus Canopy, designed by architect DiMella Shaffer, is part of the Kenmore Square Public Improvements Project. SGH performed a detailed review of the structural glass design and provided guidance on fabrication and constructability.
Explore
Northeast

Massachusetts Bay Transportation Authority, Charles/MGH Station

As part of the complete rebuilding and reconfiguring of the station, the contractor needed to remove an existing pier supporting the viaduct.  SGH designed a load-transfer system that could be installed and utilized within the single weekend shutdown permitted by the MBTA.
Explore