Cambridge, MA

Harvard Kennedy School Snow Guard Retrofit

Scope/Solutions

Looking to reinvent the campus, Harvard Kennedy School (HKS) completed a major project in 2017 to add three new buildings linking the existing structures. During the first winter after the additions were put into service, snow accumulated on horizontal metal shelves and subsequently slid off onto the walkways below. SGH helped HKS by evaluating the existing buildings’ conditions and designing a retrofit to prevent snow and ice from sliding off.

Without available industry guidance for snow retention designs, SGH developed a plan to test the performance of several snow retention options to find the best solution for the school, given the variability of weather conditions and building elements. Highlights of our work included:

  • Reviewing the buildings’ design and identifying existing conditions leading to the accumulation of snow and ice
  • Evaluated three mockups during the 2019 winter season
  • Developed design documents for the retrofit
  • Assisted HKS during the bid phase by providing a list of bidders, leading a pre-bid meeting, issuing meeting minutes and addenda, answering bidders’ questions, reviewing bids, and recommending a firm to execute the work
  • Worked with HKS to develop phasing plans and review value engineering options
  • Provided construction administration services, including reviewing contractor submittals to compare with the design intent, periodically visiting the site to observe installation of the snow guard system, and helping the contractor address field conditions

Project Summary

Icon: completion-date

2017

Completion Date
Icon: construction-value

25k

Construction Value
Client(s)
Harvard Kennedy School
Specialized Capabilities
Facades & Glazing

Key team members

Christopher Grey
Principal

Additional Projects

West

Township 14

The two buildings at 12670 and 12680 High Bluff Drive offer Class A office space to the Del Mar Heights area. SGH consulted on the building enclosure.
Explore
West

Sutter Health Eden Medical Center

By applying Integrated Project Delivery (IPD) and Building Information Modeling (BIM) approaches, the project team reduced the schedule by 12 mos. SGH was the building enclosure design consultant for the project.
Explore