Fall River, MA

Brightman Street Bridge

Scope/Solutions

During the six-year rehabilitation of the Brightman Street Bridge, SGH provided investigation and concrete design services and performed testing, analysis, and thermal modeling of mass concrete placements.

SGH helped evaluate the following:

  • Issues with tremie placement for an underwater cofferdam seal that compromised concrete quality
  • Contractor concerns about a concrete mix for approach span pier pile caps and bascule span fender beams
  • Plugged concrete pumplines during placement of the east bascule pier pile cap in cold weather
  • Mass concrete placements

 

Over the course of these projects, SGH completed the following:

  • Investigated tremie failure and blocked pumplines
  • Determined the cause of the failed mass concrete placement in the cofferdam seal
  • Performed petrographic analysis, adiabatic heat signature testing, and thermal simulations at varying placement temperatures, weather conditions, and curing periods
  • Modeled heat generation during curing
  • Retrieved and tested concrete core samples
  • Designed and tested physical properties of a replacement tremie concrete mix and monitored a trial placement
  • Proposed concrete aggregate and mixes to suit each project
  • Specified tremie and mass concrete sequencing and placement methodology
  • Recommended ways to avoid freezing pumplines, including increasing the concrete temperature, insulating pumplines, and filling the pumplines with hot water prior to pumping the concrete
  • Monitored concrete placements for the 2002 and 2004 projects

Project Summary

Icon: completion-date

2009

Completion Date
Solutions
Repair & Rehabilitation
Services
Structures | Advanced Analysis | Applied Science & Research
Markets
Infrastructure & Transportation
Client(s)
Modern Continental Construction
Specialized Capabilities
Temporary Construction | Marine & Civil Works | Computational Mechanics | Physical Testing | Materials Science | Microscopy

Key team members

Paul Kelley
Consulting Principal
William Konicki
Senior Principal

Additional Projects

Northeast

Providence Place Mall Parking Garages

The garages exhibited chronic, premature cracking and spalling of the concrete around precast double-tee flange-to-flange connections as well as other common parking structure deterioration and distress.  SGH assessed the condition of the garages and designed remedial work.
Explore
Northeast

Stop & Shop

Shop & Stop Store #505 is a one-story building constructed with a rooftop parking deck. SGH evaluated the condition of the traffic coating, the roof structure, and the exterior building walls, which were also covered with a failing elastomeric coating.
Explore