Lynn, MA

Lynn Classical High School

Scope/Solutions

Lynn Classical High School is a one- to three-story structure built on construction debris fill. Shortly after construction, staff observed water leakage and significant damage due to settlement of the structure. SGH investigated the causes of the issues.

Structural Phase. SGH investigated the causes of ongoing settlement of the slab-on-grade. In the first six years after construction, the slab settled up to 7 in. due to secondary consolidation of the construction debris stratum. The settlement resulted in significant damage to the first story, including a partially collapsed interior masonry wall, cracked and uneven slabs, broken utility lines, jammed doors, and malfunctioning mechanical and utility systems.

SGH evaluated the subsurface conditions, investigated the causes and rates of settlement, and predicted future settlement rates. We developed several repair options, including phasing repairs while keeping a portion of the building occupied.

We provided expert testimony throughout the mediation process. Following the investigation, SGH served as prime consultant, structural engineer-of-record, and geotechnical engineer-of-record for the design of slab-on-grade repairs and assisted the school with the bidding process.

Building Enclosure Phase. SGH investigated the causes of water infiltration and determined the exterior insulating finish systems (EIFS) suffered from leakage due to flashing problems, sealant failures, and application defects. We also noted that roof water draining over the EIFS caused staining. SGH designed building enclosure repairs and estimated construction costs. Our repair design included repairing EIFS and roofing, and reconstructing flashings for the masonry, windows, and HVAC louvers.

Project Summary

Icon: completion-date

2014

Completion Date
Solutions
Failure Investigation
Services
Structures | Advanced Analysis
Markets
Education
Client(s)
City of Lynn
Specialized Capabilities
Temporary Construction | Geotechnical | Failure Analysis

Key team members

Aaron Lewis
Aaron Lewis
Executive Principal, Structural Engineering, East
William Konicki
Senior Principal
Peter Nelson
Senior Principal

Additional Projects

Northeast

Three-dimensionally Printed Glass Testing

In 2017, SGH collaborated with the MIT Media Lab on an exhibit for Milan Design Week. Looking to advance their research with a new geometry, MIT retained SGH to perform additional testing on 3D-printed glass samples in 2024.
Explore
Northeast

Bridge Boston Charter School

Bridge Boston Charter School offers an intensive, success-focused learning program for the city’s at-risk students. SGH was the structural engineer of record for the adaptive reuse of the 1970s brick masonry structure, and construction of a new 3,000 sq ft addition and stand-alone gymnasium.
Explore