Winthrop, MA
MWRA Deer Island Wastewater Treatment Plant, Egg-Shaped Digesters
Scope/Solutions
The Deer Island Wastewater Treatment Plant, which is owned and operated by Massachusetts Water Resources Authority, removes pollutants from wastewater that originates in homes and businesses in the greater Boston area. Buchart-Horn, the Electric Boat Division (EBDiv) of General Dynamics, and Perini retained SGH to develop the seismic design for egg-shaped digester tanks and their supporting concrete structures.
SGH helped develop the seismic design for the eight 3-MG egg-shaped digesters and two 3-MG gas storage tanks. Highlights of our analyses include the following:
- Evaluated the structures of the digesters and storage tanks
- Designed the reinforced concrete ring walls that support the digesters and gas storage steel tanks, which included an innovative concept for the anchorage of the steel tank base plate to the ring wall used to transmit the large overturning moment.
- Performed finite element analyses that included fluid-structure interaction for horizontal and vertical ground motion
- Determined stresses in the tank wall from the impulsive components
- Computed the convective components of liquid accelerating within the steel shell
1 of 3
Project Summary
Solutions
New Construction
Services
Structures | Advanced Analysis
Markets
Infrastructure & Transportation
Client(s)
Buchart-Horn | General Dynamics
Specialized Capabilities
Seismic Engineering | Computational Mechanics
Key team members
Additional Projects
Northeast
Reservoir Woods Parking Garage
The owner of Reservoir Woods sought to provide additional parking space in a new garage, which consists of a basement level and four elevated parking levels with 923 parking spaces. We provided project management, coordination, and structural engineering services for the 280,000 sq ft garage.
Northeast
Sudbury Aqueduct
When John Eliot Elementary School was considering construction of a new driveway over the Sudbury Aqueduct, they needed a condition assessment of the aqueduct and evaluation of potential safety risks involved with the project.


