Boston-Quincy, MA

Neponset River Bridge

Scope/Solutions

Opened in 1971, Neponset River Bridge carries Morrissey Boulevard traffic over Neponset River. The superstructure consists of steel plate girders and cover-plated steel stringers supporting a 7.5 in. thick reinforced concrete deck. The girders span 108 ft, with shorter spans in the curved portion of the bridge. Nineteen twin hammerhead piers and five twin wall piers support the superstructure. In a routine inspection of the Neponset River Bridge, Metropolitan District Commission personnel found cracks in several of the piers. A subsequent engineering study found that the cracks were due to over-stresses in the flexural steel and abrupt termination of flexural steel in a tension zone.

SGH’s scope of work consisted of the following four tasks:

  • Performed load ratings for selected straight stringers and girders calculating “Operating Rating” and “Inventory Rating” by the working stress method for AASHTO standard H20 and HS20 trucks and Type 3 and Type 3S2 trucks
  • Analyzed structural adequacy of the piers for live load, dead load, and self weight and developed procedure to review reinforcing for compliance with AASHTO requirements
  • Developed concepts for reinforcing the hammerhead piers by external post-tensioning, including high-strength threadbars external to both faces of the pier and anchored to cylindrical steel cradles filled with concrete at each end of the pier
  • Performed finite element analysis for the effects of seismic accelerations on the complete in-bound half of the existing and retrofitted superstructure, piers, and foundation

Project Summary

Icon: completion-date

2004

Completion Date
Services
Structures | Advanced Analysis
Markets
Infrastructure & Transportation
Client(s)
Dewberry Architects Inc.
Specialized Capabilities
Seismic Engineering | Marine & Civil Works | Computational Mechanics

Key team members

Atis Liepins
Consulting Principal

Additional Projects

Northeast

CBD Garage

The CBD Garage is a six-level municipal parking garage constructed circa 1980. Since 2013, SGH has helped the City of Malden by assessing the structure's condition and overseeing repair designs and administration.
Explore
Northeast

Cornell University, Pedestrian Suspension Bridge

Cornell University sought to install cable net barrier systems on four university-owned bridges, including a pedestrian suspension bridge that spans over Fall Creek. SGH analyzed the existing suspension bridge structure and the effect of the cable net on the bridge.
Explore