Richland, WA

Columbia Generating Station, Seismic Probabilistic Risk Assessment

Scope/Solutions

After the Fukushima Daiichi accident, the U.S. Nuclear Regulatory Commission (NRC) issued 10 CFR 50.54(f), a letter requiring licensees to perform a re-evaluation of seismic hazard and take further actions if it exceeds their design basis. In response to this letter, Columbia Generating Station (CGS) performed a seismic probabilistic risk assessment (SPRA) of their facility.

CGS has a one-unit boiling water reactor with a Mark II containment design. Essential safety and FLEX system components are located in several buildings and the yard. CGS is a deep soil site with significant soil-structure interaction (SSI) effects on building seismic responses. SGH performed the seismic fragility scope of the CGS SPRA and highlights of our work include the following:

  • Performing seismic walkdowns and building an electronic database of results
  • Selecting reference earthquake ground motion and acceleration time histories
  • Generating probability distributions of in-structure responses by Latin hypercube sampling
  • Developing thirty randomized finite element models for structures
  • Selecting thirty representative soil profiles from 4,800 site simulations
  • Simulating SSI/SSSI responses using efficient hybrid computational methods
  • Developing novel methods for fragility evaluation to address unique conditions
  • Efficiently estimating more than 1,000 CGS-specific representative fragilities for risk ranking and prioritization of detailed evaluations
  • Developing a new approach for hybrid fragilities that improves on EPRI 1025287
  • Evaluating failure modes from building impacts and separations
  • Modeling partial correlation between major structure fragilities
  • Evaluating and screening non-vibratory hazards and upstream dam breaches
  • Supporting the CGS SPRA submittal to the USNRC

Project Summary

Icon: completion-date

2019

Completion Date
Icon: award-winner

award

Winner
Solutions
Repair & Rehabilitation
Services
Advanced Analysis
Markets
Energy
Client(s)
Energy Northwest
Specialized Capabilities
Nuclear

Key team members

Philip Hashimoto
Senior Principal
Mohamed Talaat
Technical Director

Additional Projects

West

Diablo Canyon Power Plant

PG&E retained SGH to support the re-evaluation of their Long Term Seismic Program (LTSP) for Diablo Canyon, which is situated in a high-seismic hazard zone on the central coast of California.