When the storm hit Provincetown Harbor, most of the finger piers broke away from the main dock. At MacMillian Pier, inspectors found cracks on the floats under the wood whalers and on the unreinforced side walls, and several floats fractured as workers tried to remove them from the water.
In this multiphase project, SGH performed the following services:
- Conducted a structural evaluation of the floating dock
- Investigated the damage, inspecting both failed and disassembled concrete-encased polystyrene floats
- Performed wind speed and wave height analyses and determined the loads acting on the structure at the time of the failure
- Developed a temporary repair program that enabled the town to use the float in the upcoming summer season
- Analyzed the risk of failure and determined the following:
- High winds and waves could break up the floats or damage the wood whaler system
- Cracking of the polystyrene floats could result in their disintegration
- Unreinforced concrete was prone to spalling and separation from the polystyrene
- Defined necessary maintenance, including concrete repairs and side reinforcement, for the reassembled floats while they were in temporary service
- Developed recommendations for dock replacement