Washington, DC

Walker-Jones Educational and Community Center

Scope/Solutions

Developed to promote revitalization of the surrounding Washington, DC neighborhood, the Walker Jones Educational and Community Center project includes a K-8 school with an integrated public library and community recreation center.  Hord Coplan Macht retained SGH for the structural design of the 135,000 sq ft building, which is LEED certified, achieved in part by a green roof above a portion of the recreation center and the classroom wings.

The complex was constructed and open for classes within the short time frame of sixteen months.  Highlights of SGH’s work on this project include the following:

  • Designed a pair of beams that project into the two-story library space, creating a dramatic effect within the curtain wall enclosed space
  • Designed a dual steel and masonry lateral-load-resisting system
  • Designed the cafeteria and gymnasium structures with masonry bearing walls and long-span steel roof joists
  • Designed reinforced concrete retaining walls for a below-grade portion of the building
  • Specified rammed aggregate piers, a system that increased the bearing capacity and allowed the use of common spread footings at the site that had low soil bearing capacity
  • Performed construction administration services, including review of contractor requests for information (RFI’s), submittal review, and site visits to compare as-built construction with the design intent

Project Summary

Icon: completion-date

2009

Completion Date
Icon: certification

LEED

Certification
Solutions
New Construction
Services
Structures
Markets
Education
Client(s)
Hord Coplan Macht, Inc.
Specialized Capabilities
Building Design

Key team members

Additional Projects

Mid-Atlantic

Carnegie Mellon University, David A. Tepper Quadrangle

Made possible by a generous donation from David A. Tepper, the five-story building on the new quadrangle will become the home for Carnegie Mellon’s Tepper School of Business. SGH consulted on the building enclosure for the project.
Explore
Mid-Atlantic

Duke Ellington School of the Arts

The original 1898 building, which is listed on the National Register of Historic Places, and the subsequent additions were no longer adequate to meet the school’s mission. SGH evaluated the historic building components to remain and consulted on the design of new building enclosure systems.
Explore