Waukesha, WI

Waukesha Water Utility Garage and Maintenance Building

Scope/Solutions

The Waukesha Water Utility Garage and Maintenance Building, added in the early 1960s, houses equipment storage and an employee break room on the first level and an L-shaped parking deck and mechanical rooms on the second level. The building was suffering from water infiltration through the parking deck into the occupied spaces. SGH investigated the cause of leakage, and subsequently designed and oversaw repairs.

SGH reviewed past studies of the building and investigated the condition of the second-level structure comprising precast concrete mono-wing members topped with a waterproofing membrane and a post-tensioned concrete wearing slab. We determined the existing waterproofing had exceeded its useful life and pervasive water infiltration caused the structure to deteriorate. SGH developed three remedial options for the Water Utility Commission’s consideration.

The commission opted to remove and replace the existing wearing slab and waterproofing. This approach also exposed the precast structure, allowing the contractor to perform both topside and underside concrete repairs. The rehabilitation project also included upgrades to pedestrian and vehicular barriers to meet the current building code requirements.

SGH developed construction documents for the repairs, assisted with the bidding processes, and provided construction administration services. In addition to overseeing the construction, we collaborated with the contractor to address unforeseen field conditions exposed during the work.

Project Summary

Icon: completion-date

2016

Completion Date
Icon: construction-value

550K

Construction Value
Icon: building-size

7K Parking Area

Project Size
Solutions
Repair & Rehabilitation
Services
Structures | Building Enclosures
Markets
Infrastructure & Transportation
Client(s)
Waukesha Water Utility
Specialized Capabilities
Repair & Strengthening | Roofing & Waterproofing

Key team members

Peter Babaian
Peter Babaian
Managing Principal, Building Technology, Chicago
Neal Anderson
Technical Director
Emily O'Keefe
Project Director

Additional Projects

West

Central Arizona Project

SGH evaluated the failure risk resulting from the loss of prestress, determined pipe repair priorities, and subsequently designed post-tensioning repairs and safe excavation for the repair pipe.
Explore